
Summit Ridge Roofing
Eight services · one crew · no subcontractors
What we do
Every job on this list is done by the crew that shows up to quote it. No sales team, no lead handoff, no subcontractors. Pick whichever one sounds like your problem — each page spells out how the work actually runs, day by day.


Repairs, replacements and the things that cause both
The full list
4:12–9:12
01
Full roof replacement — asphalt shingle
Tear off to the deck, inspect every sheet of plywood, rebuild the assembly properly, haul everything away. Most Markham semis and two-storeys are a one to two day job.
View more
Diagnosis first
02
Roof repair & leak diagnosis
A stain on the ceiling is almost never directly under the hole. We find where water actually enters — usually a valley, a flashing, or a nail that backed out — before anyone quotes you a new roof.
View more
Same-day tarp
03
Emergency storm & wind damage
Shingles gone after a windstorm, a branch through the deck, water coming in tonight. We tarp it, stop the water, then quote the permanent repair in daylight.
View more
Under 2:12
04
Flat & low-slope roofing
Additions, garages, and porch roofs under 2:12 can't take shingles. These need a membrane, proper drainage, and correctly detailed edges and curbs.
View more
5 inch and 6 inch
05
Eavestrough, soffit, fascia
Water has to get off the roof and away from the foundation. Undersized troughs, rotted fascia, and blocked soffit vents cause damage that gets blamed on the roof.
View more
Step + counter
06
Skylight & chimney flashing
Most leaks that look like roof failures are failed flashing details. Skylights and chimneys need step flashing and counter flashing, not a bead of caulk.
View more
Intake + exhaust
07
Attic ventilation & insulation
A hot attic in July cooks shingles from underneath and shortens their life. A warm attic in January melts snow, which refreezes at the eave and pushes water back under the roof.
View more
≥ 900 mm
08
Ice dam prevention & removal
If you get an ice ridge along the eaves every winter, the roof is losing heat. We remove the dam safely with steam, then fix the cause — ventilation, insulation, and shield coverage.
View more
Deck to ridge cap · seven layers · 4:12 typical Markham pitch
What is actually on your roof
A roof is not shingles. Shingles are the last layer of seven, and they are the only one you can see from the ground. Every corner a cheap quote cuts is in the six layers underneath. Here is the whole assembly, in order, with the numbers that matter.
01
Roof deck
3/8 to 7/16 inch plywood or OSB
02
Ice-and-water shield
Minimum 900 mm up from the eave edge
03
Synthetic underlayment
Over the full remaining field
04
Drip edge & starter strip
Metal at eaves and rakes
05
Shingles
4 to 6 nails per shingle, in the nail line
06
Attic ventilation
Intake at the soffit, exhaust at the ridge
07
Ridge cap
Purpose-made cap over the vent
Not sure which one you need?
Describe what you are seeing and we will tell you whether it is a repair or a replacement. If it is a repair, we say so. Rated 5.0 by homeowners across Markham and York Region.